Mann Construction

Mann Construction offers more than just a building company. We comply with all the latest building regulations, health and safety procedures to ensure quality construction.

 


Contact:

Phone:
Office: 057 93 52136
Tadgh: 087 261 0598
E-mail: info@mannconstruction.ie

Links:

mannplastermouldings.ie
mannheatrecovery.ie

Passive Housing » TWO STOREY


Area: 2600sq/ft���� Bedrooms:4nr
1. 3 course of blocks from top of foundation to sub floor.�� ��� ��� ��� ��� ��� �
2. 150mm concrete ground floor with D.P.M. underneath and 1 layer of Kingspan 80mm+ foil back and D.P.M. underneath.�� ��� ��� ��� ��� ��� ��� ��� ��� ��� �
3. Radon sump under ground floor slab.�� ��� ��� ��� ��� ��� ��� �
4. Precast concrete cills & lintels.�� ��� ��� ��� ��� ��� ��� ��� �
5. 320mm cavity external wall construction consisting of 100mm solid block external leaf, with 80mm cavity wall insulation, and 100mm solid block internal leaf or external walls.�� ��� ��� ��� ��� �
6. 100mm block internal walls ground floor.�� ��� ��� ��� ��� ��� ��� �
7. 1 chimney with 1 chimney pot.�� ��� ��� ��� ��� ��� ��� ��� �
8. Steel R.S.J.s where necessary.�� ��� ��� ��� ��� ��� ��� ��� �
9. Timber joists with plywood boards to top including 150mm quilt insulation to first foor.�� ��� �
10. Traditional cut roof with concrete tiles and ridges with 300mm quilt Insulation to ceiling joists in attic.�� �
11. Woodgrain PVC windows and doors externally�� ��� ��� ��� ��� ��� ��� �
12. Black/White uPVC fascia, soffit, gutters and downpipes.�� ��� ��� ��� ��� ��� �
13. Napp plaster finish to the external walls�� ��� ��� ��� ��� ��� ��� �
14. Hardwall skimmed finish to the internal walls.�� ��� ��� ��� ��� ��� �
15. Stud Partitions, with 1 layer of plasterboard skim finish to both sides to first floor�� ��� ��� �
16. Foil backed plasterboard, skimmed finish to ceilings.�� ��� ��� ��� ��� ��� �
17. Pine or regency panel internal doors with brass lever handles�� ��� ��� ��� ��� �
18. White Deal moulded architrave and skirtings�� ��� ��� ��� ��� ��� ��� �
19. Red Deal Timber stairs with half landing including balustrades and handrails.�� ��� ��� �
20. Hotpress shelving complete with immersion unit.�� ��� ��� ��� ��� ��� �
21. Standard electrical installation connected to metre box�� ��� ��� ��� ��� ��� �
22. Standard external oil fired boiler connected to hot water clyinder & convector radiators to each room including oil tank, base and oil line.�� ��� ��� ��� ��� ��� ��� ��� �
23. All internal plumbing to kitchen & utility and bathrooms�� ��� ��� ��� ��� ��� �
24. Supply & installation of sanitaryware�� ��� ��� ��� ��� ��� ��� �
25. All foul and service water drainage�� ��� ��� ��� ��� ��� ��� ��� �
26. All incoming services up to 20m to road for water, esb, eircom.�� ��� ��� ��� ��� �
27. Connection to waste water treatment system & Pecolation�� ��� ��� ��� ��� ��� �
28. Wastewater treatment system to be supplied by client.�� ��� ��� ��� ��� �
29. Rough stone drive up to 20m from road and around perimeter of house.