Passive Housing » DORMER



   Area: 2600sq/ft     Bedrooms:4nr
1. 3 course of blocks from top of foundation to sub floor.               
2. 150mm concrete ground floor with D.P.M. underneath and 1 layer of Kingspan 80mm foil back and D.P.M. underneath.                           
3. Radon sump under ground floor slab.                       
4. Precast concrete cills & lintels.                       
5. 320mm cavity external wall construction consisting of 100mm solid block external leaf, with 80mm cavity wall insulation, and 100mm solid block internal leaf or external walls.   
6. 100mm block internal walls ground floor.                       
7. 1 chimneys with 1 chimney pots.                       
8. Steel R.S.J.s where necessary.                           
9. Timber joists with plywood boards to top including 150mm quilt insulation to first foor.
10. Traditional cut roof with concrete tiles and ridges with 300mm quilt Insulation to ceilng joists in attic    
11. 150mm thermapitch TP50 rigid insulation to coved ceilings           
12. Woodgrain PVC windows and doors exteranly                   
13. Black/White uPVC fascia, soffit, gutters and downpipes.               
14. Napp plaster finish to the external walls                   
15. Hardwall skimmed finish to the internal walls.                   
16. Stud Partitions, with 1 layer of plasterboard skim finish to both sides to first floor.   
17. Foil backed plasterboard, skimed finish to ceilings.                   
18. Insulated plaster slab skimmed finish to coved ceilings                   
19. Pine or regency panel internal doors with brass lever handles               
20. White Deal moulded architrave and skirtings                   
21. Red Deal Timber stairs with half landing including balustrades and handrails.       
22. Hotpress shelving complete with immersion unit.                   
23. Standard electrical installation connected to metre box               
24. Standard external oil fired boiler connected to hot water clyinder & convector radiators to each room including oil tank, base and oil line.                   
25. All internal plumbing to kitchen & utility and bathrooms               
26. Supply & installation of sanitaryware                       
27. All foul and service water drainage                       
28. All incoming services up to 20m to road for water, esb, eircom.           
29. Connection to waste water treatment system & Percolation               
30. Wastewater treatment system to be supplied by client.High quality the best and most fashionable cheap replica watchesfake watches online of the replica watches store.